Legislation Details

File #: 24-029    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 1/10/2024 In control: City Commission
On agenda: 1/22/2024 Final action:
Title: Resolution authorizing the City Manager to execute Engineering Work Order Modification No. 2 with Wade Trim, Inc. for the Park Road Collection System Expansion.
Sponsors: Granicus User
Attachments: 1. 2024-01-12 - RESOLUTION - Park Road Collection (Wade Trim), 2. 21-020-06L-01 Mod2 EWO Wade Park Road Collection Systems Expansion - vendor signed.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

                                                               AGENDA REPORT

 

 

 

DATE:                                          January 22, 2024

 

TO:                                          City Commission

 

FROM:                                          Bill McDaniel, City Manager

 

SUBJECT:                     Engineer Work Order Modification #2 with Wade Trim, Inc. for

                                                               the Park Road Collection System Expansion

 

 

EXECUTIVE SUMMARY:

 

The City Commission approved Engineering Work Order 21-020-06L-01 with Wade Trim, Inc. on February 13, 2022, to provide design services for the Park Road Collection System Expansion project including surveying, geotechnical investigation, and the development of the detailed design. The first modification included construction engineering inspection services (CEI) to support the construction phase approved on May 8, 2023.

 

The Park Road Collection System Expansion is partially funded by the American Recovery Plan Act (ARPA). According to the ARPA funding agreement item (15) b, the contractor is required to comply with the Davis-Bacon Act. The modification includes the efforts from the consultant to inspect and audit the Davis-Bacon Act requirement provided by the contractor. In addition, the consultant will provide the hydraulic modeling to confirm the capacity of the proposed pumps will operate with multiple lift stations that manifold into the 12” force main along Wilder Road. The additional cost of $25,425 for modification #2 is required to complete the Park Road Collection System Expansion.

 

•                     Original Work Order Price: $199,849.00 (Design)

•                     Approved modification#1 for Construction Engineering Services: $171,596.00 (CEI)

•                     Proposed modification#2: $ 25,425.00

•                     Total Consultant Cost: $396,870.00

 

RECOMMENDATION:

 

That the City Commission authorize the City Manager to execute an Engineering Work Order Modification 2 with Wade Trim, Inc., for the Park Road Collection System Expansion Project, for $25,425.

 

FISCAL IMPACT:

 

Funds are available in CIP # UM035 - Park Road Collection System Expansion

 

 

Prepared by:  Jay Kwag, PE, PMP, CIP Engineering Manager