Legislation Details

File #: 26-209    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 4/29/2026 In control: City Commission
On agenda: 5/11/2026 Final action:
Title: Resolution authorizing the City Manager to execute Engineering Work Order Modification 1 with Wade Trim, to evaluate the roadway around Water Reclamation Facility Ponds and provide the recommendation for repair and rehabilitation.
Sponsors: Granicus User
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

                                                               AGENDA REPORT

 

 

 

DATE:                                          May 11, 2026

 

TO:                                          City Commission

 

FROM:                                          Bill McDaniel, City Manager

 

SUBJECT:                     Engineering Work Order Modification 1 with Wade Trim

                                                               

   

EXECUTIVE SUMMARY:

                                          

The City operates and maintains the Water Reclamation Facility (WRF) located at 1500 W. Victoria Street. On January 12, 2026, the City Commission approved a work order under the continuing engineering contract RFQ21-020EN-FC with Wade Trim, Inc. to evaluate multiple facility components and develop repair and replacement recommendations throughout the WRF.

 

The Utilities Department has identified the need to expand the scope of work to include an evaluation of the existing roadway surrounding the pond. This roadway is used daily by multiple departments, and concerns have been raised regarding its condition and its ability to accommodate heavy equipment and truck traffic. This proposed modification adds a task for Wade Trim, Inc. to assess the roadway's condition and provide recommendations for appropriate repair and rehabilitation measures. The original work order amount is $76,054. Modification No. 1 adds $22,010 for additional scope. The revised total work order amount is $98,064. 

 

RECOMMENDATION:

 

That the City Commission authorize the City Manager to execute Engineering Work Order Modification 1 with Wade Trim, in the amount of $22,010, to evaluate the roadway around Water Reclamation Facility pond and provide the recommendations for repair and rehabilitation.

 

FISCAL IMPACT:

 

The cost will be shared between Utilities Operation and Solid Waste Operating budget.

 

 

Prepared by:  Jay Kwag, PE, PMP, Utilities Engineering Manager