AGENDA REPORT
DATE: June 8, 2026
TO: City Commission
FROM: Bill McDaniel, City Manager
SUBJECT: North Warnell Street Infrastructure Improvements
EXECUTIVE SUMMARY:
CivilSurv Design Group, Inc. completed a Preliminary Engineering Report in December 2022 and outlined conceptual improvements to remove stormwater ponding along N. Warnell Street (from E. Gilchrist St to E. Tomlin St), and along E. Tomlin Street (from N. Warnell St to N. Gordon St). The FY25/FY26 Brick Road Restoration efforts also lie within these roadway corridors and will need to include watermain replacement due to the existing 6-inch water main shallow depth, conflicts with existing drainage structure(s), and lead joints.
The proposed infrastructure improvements span along N. Warnell St (from E. Baker St to E. Tomlin St) and along E. Tomlin St (from N. Warnell St to N. Gordon St), and will include rehabilitation of the existing brick pavers with new base & resetting the brick pavers, granite curb removal/replace with concrete curb, roadway drainage & grading, sidewalk extensions, driveway reconstruction, and replacement of approximately 1,430 LF of 6-inch diameter watermain and appurtenances.
RECOMMENDATION:
That the City Commission authorize the City Manager to execute Engineering Work Order 21-020-01G-04 with CivilSurv Design Group, Inc., in the amount of $190,300.00.
FISCAL IMPACT:
Funds are available in CIP #ST029 - Brick Road Restoration
Prepared by: Herby Jean, Project Manager